Saturday, 28 October 2017

FYP2 - CHAPTER 4 (DC VOLTAGE RESULT)



         CHAPTER 4




RESULTS AND DISCUSSIONS 



     Result for the DC voltage value


  
DC (coordinate current) in venture is the unidirectional stream or development of electric charge bearers. The power of the electric current can change with time, however the general heading of development remains the same constantly. As a descriptive word, the term DC is utilized as a part of reference to voltage whose extremity never turns around and to give battery bank associated from dc voltage.


All things considered the immediate current is created by electrochemical and photovoltaic cells and batteries. Conversely, the power accessible from utility mains in many nations is AC voltage (substituting current). Utility AC can be changed over to DC by methods for a power supply comprising of a rectifier (which to keeps the stream of current from switching), and a channel (which disposes of current throbs in the yield of the rectifier in ventures).

Tuesday, 17 October 2017

FYP2 - PROJECT PROTOTYPE PROCESS



Rectifier soldering process 


Soldering proses to connect all component with follow the simulation circuit for rectifier. This proses should be done with carefully. That because, if have a short circuit it will give the effect to all the circuit.

Friday, 6 October 2017

FYP2 - CHAPTER 4 (INTRODUCTION)



        CHAPTER 4


RESULTS AND DISCUSSIONS


4.1       INTRODUCTION

This chapter will discuss about every task that has been done in order to complete this project. Testing of the project consists of battery bank test, dynamo test, Motor test, rectifier circuit test, and functional test of electrical component when connected to electrical component. The function of electricity that occur also will explain through this chapter. From the task that carried out, the results that obtained from this project will be explained throughout this chapter.


In order to test this project, the electrical part is connected to electronic part and switch off each miniature circuit that connected to load to sees when project running is occur what it will display at bulb.

Tuesday, 3 October 2017

FYP2 - ACKNOWLEDGEMENT

Alhamdulillah, first of all thank to Allah S.W.T that make this project successful. I would like to express my deepest appreciation to al...